Project Info
Repainting of the epoxy power plant and CPF workshop floors, rehabilitation Gypsum walls, two toilets, door locks and R...
Start Date
2023-11-21
End Date
2024-11-21
Owner
BAPCO
Location
PS#2-At Aljabalain
Contract Value
86342.00 USD
Repainting of the epoxy power plant and CPF workshop floors, rehabilitation Gypsum walls, two toilets, door locks and R...
2023-11-21
2024-11-21
BAPCO
PS#2-At Aljabalain
86342.00 USD